Ongoing Works
 
WORKS ON HAND (As on 15th April, 2022)
Sl.
No
Description of Project Client Contract
Value
(Rs.in  Lakhs.)
Balance Work
(Rs.In Lakhs.)
1 JCR-DLIS Package-II/2 - Formation of Earthen Bund of Lingampally Reservoir with a capacity of 10.78 TMC from Km. 5.800 to Km 7.700 including Concrete Dam 0.200 Kms from Km 5.925 to Km 6.125 and other Concrete work components Viadcut, Cross Regulator, Escape/Head Regualtor along with all its associated components of work. Superintending Engineer, I& CAD Dept., JCR-DLIS Cricle, KC Colony, Chintagattu, Warangal, Telangana State-506015                 34,148.80          34,148.80
2 Excavation of Sand work of Pakcage Sardhana-1 of Telangana State  Managing Director,
TSMDCL, HMWSSB Premises, 3rd Floor, Khairatabad, Hyderabad
                     315.04               245.72
3 Excavation of Sand work of Pakcage Kollur-5 of Telangana State                       452.38               204.12
4 Minor Irrigation Construction of Check Dam across Manair Vagu near Kistampet (V) Srirampur (M) PeddapallyDistrict Superintending Engineer
Irrigation Circle, karimnagar
                  1,669.63            1,669.63
5 Minor Irrigation - Construction of Check Dam across Manair Vagu near Gollapally (V), Sultanabad (M), Peddapally District.  Superintending Engineer
Irrigation Circle, karimnagar
                  1,591.11            1,591.11
6 Minor Irrigation - Construction of Check Dam across Manair Vagu near Neerukulla (V), Sultanabad (M), Peddapally District. Superintending Engineer
Irrigation Circle, karimnagar
                  1,592.52               679.81
7 Minor Irrigation - Construction of Check Dam across Manair Vagu near Manchirami  (V), Sultanabad (M), Peddapally District. Superintending Engineer
Irrigation Circle, karimnagar
                  1,472.74            1,472.74
8 Minor Irrigation - Construction of Check Dam across Manair Vagu near Motlapally (V), Srirampur (M), Peddapally District. Superintending Engineer
Irrigation Circle, karimnagar
                  1,123.29            1,123.29
9 Kaleshwaram Project-Link-II-Pkg-III-Addnl 1.10 TMC -Enhancing the existing discharge carrying capacity of FFCto986 Cumecs(3TMC/day) with lining, modifications to CD&CM from Km 95.275 to Km 109.00. Superintending Engineer
Kaleswaram project Circle No2
LMD Colony, Karimnagar
                  6,804.64            6,804.64
 (our share portion of JV i.e 30% of CV Rs.22,682.12 Lakhs) 
10 Package No. 15 - SRLIP to PALERU LINK CANAL - EW Excavation, formation of embankment and CC lining including construction of CM&CD works from Km. 39.500 in Mahabubabad District to Km. 62.700 in Khammam Dist. Superintending Engineer & Project Administrator, SRLIP-2, Beside ACP Office, VDO's Colony, Khammam, TS                 12,722.60          12,722.60
 (our share portion of JV i.e 35% of CV Rs.36,350.23 Lakhs) 
11 Package-2-Construction of Road bed, Major bridges, minor bridges, ROBs & RUBs Construction of Yavatmal-Nanded new BG Line From km 110 to km 157 (Near Digras Station) of Central Railway in Maharashtra State, India. RVNL, 7TH Floor, New Adminstrative Building, Central Railway, DN Road, CST, Mumbai- 400001                 21,983.27          20,653.39
 (our share portion of JV i.e 49% of CV Rs.44863.82 Lakhs) 
12 Construction of Four Lane Major Bridge across Manjara River near Yesgi Village on Renapur Udgir Degloor Aadampur Phata Sagroli Road on NH63 in Tq. Biloli Di. Nanded in state of Maharashtra in EPC Mode. Chief Engineer, PWD, Maharashtra  7787.90
(Our share portion is 70% of C.V.of
Rs.11,125.56 Lakhs) 
           7,787.90
13 Irrigation & CAD Department- JCRDLIS -  under Package-VI, Phase-III of JCR-DLIS SE, Irrigation Circle, Warangal, I&CAD  7,866.73
(Our share portion is 20% of C.V.of
Rs.39,333.67 Lakhs) 
           7,866.73
14 Construction of Sandul Barrage Project near village Dutta across river sandul in the district Kalahandi including Hydro-Mechanical Works, Power Connectivity Works, Road Connectivity, project of State of Odisha WRD, CE&BM, kalahandi, Odisha                 12,833.32          12,833.32
15 De-siltation of Sand 6,03,500 CBM from Pothkapalli Block-2 sand reach at Peddapalli District  Managing Director, TSMDCL, Dept.og Industies & Commerce, GoTS, HMWSSB Premises, Rear Block, 3rd Floor, Khairatabad, hyderabad-500 004                      701.63               701.63
16 De-siltation of Sand 7,43,750 CBM from Indurthy Block -1 sand reach at Peddapalli District                       864.68               864.68
17 Strengthening of Strom water drains in Karimnagar Under Smart city Mission Managing Director, KSCCL, Karimnagar
                  8,632.01            8,632.01
 (Our share portion of JV i.e 80% of CV Rs.10790.01 Lakhs)
18 Integrated Road Redesign – Other Roads Phase 2 in Karimnagar under Smart Cities Mission Managing Director,
KSCCL, Karimnagar
                  5,638.30            5,638.30
 Our share portion of JV i.e 80% of CV Rs.7047.87 Lakhs)