Completed Works
WORKS COMPLETED AS A PRIME CONTRACTOR
Sl. No Major Projects Completed Client Contract Value (in Crs.)
1 Balance work for Earth work excavation and Formation of Embankment from Km 2.000 to L/s End Pier, Construction of Spillway from Spillway Blocks 1 to 15, L/s NOFs’ 1 to 4 upto road bridge level and Spillway Blocks 16 to 26 from crest level to road bridge level including Supply ,fabrication and erection of Gates, Infall regulator, R/s Off-Take Sluice, L/s Guide bank etc., of Mid Manair Reservoir (Left Flank) near Manwada (V), Boinpally (M),  Rajanna Sircilla  Dist. SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR                468.14
2 Construction of Sandul Barrage Project near village Dutta across river sandul in the district of Kalahandi including Hydro-Mechanical Works, Power Connectivity Works, Road Connectivity, Staff Quarters including Design and estimate of all Components with Operation and Maintenance of the Barrage Project for a Period of five years or five Flood Seasons whichever is more after successful commissioning of the project of State of Odisha. SE, Kalahandi Irrigation Division, Odisha                162.92
3 Development of smart roads in karimnagar under Smart City Mission (Pacakge-I) Karimnagar Smart City Corp Ltd.                112.97
4 Development of smart roads in karimnagar under Smart City Mission  (Pacakge-II)                117.21
5 Strengthening of Storm Water Drains in Karimnagar under Smart Cities Mission                189.79
6 Integrated Road Redesign – Other Roads Phase 2 in Karimnagar under Smart Cities Mission                119.65
7 Construction of Four Lane Major Bridge across Manjara River near Yesgi Village @ 276/500 on Renapur Udgir Degloor Aadampur phata Sagroli Road on NH-63 in Tq. Biloli Di. Nanded in state of Maharashtra in EPC Mode. Ministry of Road Transport & Highways, NH Division, Nanded, Maharashtra.                111.26
8 IFFC Project from SRSP: Construction of spillway and formation of Right side Earth Bund upto TBL El.+323.00 mts from R/s Retaining wall to end of Earth bund Ch.9.250 Km. including all items, instrumentation arrangements etc. (Excluding R/S OT sluice structure at Ch8.525 KM)- Mid-Manair Reservoir (Right Flank) Near(V), Boinpally(M), Karimnagar Dist. SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR                  98.68
9 IFFC Project-Construction of Link Canal from Km.0.00 (MMR R/s Canal @KM.36.125, end of Package-II) to Km.6.90 (Joining at Km.0.650 of Approach Channel of Thotapally Lift Scheme Package-5) and Branch Canal to connect to MMR R/s Canal beyond Thotapally from Km.0.00 to Km.1.250, including CM &CD works in Karimnagar district SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR                  97.79
10 Kaleshwaram Project – Dr.B.R.Ambedkar Pranahitha Chevella Sujala Sravanthi –Link-II Pkg No.7 (Improvements & enhancing the existing capacity of the Medaram Reservoir to 0.58TMC. SE, I & CAD, Kaleshwaram Proj Circle-2
Karimnagar
                 76.82
11 Pkg.2 -“Levelling and Grading works for 5x800 MW Yadadri Thermal Power Station At Veerlapalem (V), Dameracherla (M), Nalgonda  Dist, Telangana State” BHEL, PSSR, Chennai                  57.06