| Sl. No |
Major Projects Completed |
Client |
Contract Value (in Crs.) |
| 1 |
Balance work for Earth work excavation and Formation of Embankment from Km 2.000 to L/s End Pier, Construction of Spillway from Spillway Blocks 1 to 15, L/s NOFs’ 1 to 4 upto road bridge level and Spillway Blocks 16 to 26 from crest level to road bridge level including Supply ,fabrication and erection of Gates, Infall regulator, R/s Off-Take Sluice, L/s Guide bank etc., of Mid Manair Reservoir (Left Flank) near Manwada (V), Boinpally (M), Rajanna Sircilla Dist. |
SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR |
468.14 |
| 2 |
Construction of Sandul Barrage Project near village Dutta across river sandul in the district of Kalahandi including Hydro-Mechanical Works, Power Connectivity Works, Road Connectivity, Staff Quarters including Design and estimate of all Components with Operation and Maintenance of the Barrage Project for a Period of five years or five Flood Seasons whichever is more after successful commissioning of the project of State of Odisha. |
SE, Kalahandi Irrigation Division, Odisha |
162.92 |
| 3 |
Development of smart roads in karimnagar under Smart City Mission (Pacakge-I) |
Karimnagar Smart City Corp Ltd. |
112.97 |
| 4 |
Development of smart roads in karimnagar under Smart City Mission (Pacakge-II) |
117.21 |
| 5 |
Strengthening of Storm Water Drains in Karimnagar under Smart Cities Mission |
189.79 |
| 6 |
Integrated Road Redesign – Other Roads Phase 2 in Karimnagar under Smart Cities Mission |
119.65 |
| 7 |
Construction of Four Lane Major Bridge across Manjara River near Yesgi Village @ 276/500 on Renapur Udgir Degloor Aadampur phata Sagroli Road on NH-63 in Tq. Biloli Di. Nanded in state of Maharashtra in EPC Mode. |
Ministry of Road Transport & Highways, NH Division, Nanded, Maharashtra. |
111.26 |
| 8 |
IFFC Project from SRSP: Construction of spillway and formation of Right side Earth Bund upto TBL El.+323.00 mts from R/s Retaining wall to end of Earth bund Ch.9.250 Km. including all items, instrumentation arrangements etc. (Excluding R/S OT sluice structure at Ch8.525 KM)- Mid-Manair Reservoir (Right Flank) Near(V), Boinpally(M), Karimnagar Dist. |
SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR |
98.68 |
| 9 |
IFFC Project-Construction of Link Canal from Km.0.00 (MMR R/s Canal @KM.36.125, end of Package-II) to Km.6.90 (Joining at Km.0.650 of Approach Channel of Thotapally Lift Scheme Package-5) and Branch Canal to connect to MMR R/s Canal beyond Thotapally from Km.0.00 to Km.1.250, including CM &CD works in Karimnagar district |
SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR |
97.79 |
| 10 |
Kaleshwaram Project – Dr.B.R.Ambedkar Pranahitha Chevella Sujala Sravanthi –Link-II Pkg No.7 (Improvements & enhancing the existing capacity of the Medaram Reservoir to 0.58TMC. |
SE, I & CAD, Kaleshwaram Proj Circle-2
Karimnagar |
76.82 |
| 11 |
Pkg.2 -“Levelling and Grading works for 5x800 MW Yadadri Thermal Power Station At Veerlapalem (V), Dameracherla (M), Nalgonda Dist, Telangana State” |
BHEL, PSSR, Chennai |
57.06 |